Burj Khalifa

Burj Khalifa, formerly known as Burj Dubai, is a skyscraper in Dubai, United Arab Emirates, and is currently the tallest man-made structure ever built, at 828 m (2,717 ft). Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010.The building is part of the 2 km2 (490-acre) flagship development called Downtown Burj Khalifa at the "First Interchange" along Sheikh Zayed Road, near Dubai's main business district.

 

The tower's architecture and engineering was performed by Skidmore, Owings, and Merrill of Chicago. Adrian Smith, who worked with Skidmore, Owings and Merrill until 2006, was the chief architect and Bill Baker was the chief structural engineer for the project. The primary contractor was Samsung C&T of South Korea, who also built the Taipei 101 and Petronas Twin Towers. Major subcontractors included Belgian group Besix and Arabtec from the UAE. Turner Construction Company was chosen as the construction project manager. Under UAE law, the Contractor and the Engineer of Record are jointly and severally liable for the performance of Burj Khalifa. Therefore, by adoption of SOM's design and by being appointed as Architect and Engineer of Record, Hyder Consulting was legally the Design Consultant for the tower.

The total cost for the Burj Khalifa project was about US$1.5 billion; and for the entire new "Downtown Dubai", US$20 billion. Mohamed Ali Alabbar, the Chairman of Emaar Properties, speaking at the Council on Tall Buildings and Urban Habitat 8th World Congress, said in March 2009 that the price of office space at Burj Khalifa had reached US$4,000 per sq ft (over US$43,000 per m2) and that the Armani Residences, also in Burj Khalifa, were selling for US$3,500 per sq ft (over US$37,500 per m2). The completion of the tower coincided with a worldwide economic slump and overbuilding, causing it to be described as "the latest ... in [a] string of monuments to architectural vacancy."

Record Height

Preceded by Taipei 101

General Information

Cost: $1.5 billion
Location: Dubai, UAE
Status: Complete
Groundbreaking: September 21, 2004
Opening: January 4, 2010
Use: Mixed-use

Height

Antena/Spire: 828 m (2717ft)

Technical Details

Floor count: 206 floors
Flore area: 334,000m2

 


More Articles
News Headlines
Dubai Camel Milk Producers Hope To Expo...
Published:Sat, 21 Aug 2010 22:08:01 -0700
Whats Your Reaction? DUBAI, United Arab Emirates (AP) -- The camels know the drill by heart. Just after dawn, they file on their own -- always in groups of 12 -- into metal stalls......
Business : Dubai non-oil trade soars 18...
Published:Sat, 21 Aug 2010 12:02:48 -0700
DUBAI The value of non-oil trade exchange between Dubai and the world surged 18 per cent in the first half of the year, a top official said on Saturday.......
Dubai to Update Asian Investors About I...
Published:Fri, 20 Aug 2010 02:40:54 -0700
The Dubai Department of Finance will hold a series of non-deal fixed-income investor meetings in Asia starting on Aug. 26, the government of Dubai said in an e-mailed statement to......
Dubais Asia roadshow may signal future ...
Published:Fri, 20 Aug 2010 08:36:27 -0700
DUBAI: Dubai will launch a late August roadshow for fixed-income investors in Asia, a government statement said, a move analysts say hints the emirate may issue bonds later this y......
Dubais Asia roadshow may signal future ...
Published:Fri, 20 Aug 2010 14:01:11 -0700
DUBAI: Dubai will launch a late August roadshow for fixed-income investors in Asia, a government statement said, a move analysts say hints the emirate may issue bonds later this y......




Dodge Community Forum